Bismillah Electronics Hybrid Solar Power Project, Haripur KPK

Kompas Solar Pvt. Ltd. successfully implemented a hybrid solar power system for Bismillah Electronics to achieve reliable, efficient, and sustainable energy independence for commercial operations in Haripur, Khyber Pakhtunkhwa.

Project Overview

This hybrid solar installation was designed to ensure consistent power supply, lower electricity costs, and promote green energy adoption. Kompas Solar Pvt. Ltd. engineered and installed the system with advanced hybrid technology integrating smart energy management and long-term durability.

  • Project Type: Hybrid Commercial Installation

  • Installed By: Kompas Solar Pvt. Ltd.

  • Location: Haripur, Khyber Pakhtunkhwa, Pakistan

  • System Capacity: 10.5 kW Hybrid Setup

System Components

List the main hardware with small icons or cards:

    • Inverter: FoxESS KH10.5 kW Hybrid Inverter

    • Battery: EP11 Lithium Iron Phosphate (LiFePO₄) Battery

    • Solar Panels: Canadian Solar 585 W TOPCon

    • System Type: Hybrid Commercial

Key Features

  • Smart energy management for grid and battery optimization

  • Real-time monitoring via mobile and web platforms

  • Load shifting for reduced energy costs

  • High-efficiency panels for consistent year-round output

  • Long-term reliability with extended manufacturer warranties

Project Impact & Sustainability

This hybrid solar project demonstrates the power of renewable technology to deliver energy efficiency, cost reduction, and operational reliability. Bismillah Electronics now benefits from uninterrupted power and reduced reliance on the national grid—supporting Pakistan’s journey toward a greener, sustainable future.

Why Choose Kompas Solar

At Kompas Solar Pvt. Ltd., we deliver high-performance, tailor-made solar systems that empower businesses with smart, scalable, and sustainable energy solutions. Our expertise ensures every installation provides long-term value, reliability, and innovation.

Do you need professional solar system design or installation services in Pakistan and AJK?

Scroll to Top